This will vary depending on the extent of the work that is required. For a standard 4 cylinder engine this will usually take between 3 to 5 working days depending on our workload. (This can be advised at the time of enquiry.) It is important to us, to get you back on the road as soon as possible, so if you have a specific timeframe in mind, please ensure you let us know.

© COPYRIGHT 2024 GER Engine Specialists. ALL RIGHTS RESERVED.